Fourth of July weekend, and I was actually off. Phone in a drawer, kids outside, something on the grill. The fleet kept opening MRs, the merge train held the line, nobody paged me. I spent a lot of years being the load-bearing wall. Turns out the quiet reward for building the tracks right is that the thing stands up fine while you're not holding it up.